Activate the Boot Loader mode of the Solar-Log™ Smart Relay Station: Hold both buttons pressed down for 3 seconds.The devices found are listed in the software.The software automatically searches for the Solar-Log™ Smart Relay Stations within the local area network.(See also GUDE „Expert Net Control 2312“ user manual) The latest GBL_Conf is 2.7.11 and has additionally the port HTTPS in the configuration. In the manual, you will find the screenshots of GBL_Conf 2.7.7. The program, as well as the firmware file, can be found under: Download and install the Gude System Tool (GBL_Conf.exe).The commissioning steps must be completed.The Solar-Log™ Smart Relay Station is equipped with a standard Ethernet RJ45 network socket that can be connected with any commercially available network cable. View of network topology 3.2 Configuration – IP Address of Solar-Log™ Smart Relay Station 2.2 Block Diagramīlock diagram for the Solar-Log™ Smart Relais Station 1 x 16Aīlock diagram for the Solar-Log™ Smart Relais Station 3 x 16A Connect the sensor (if any) to the device.Attach a switch (if any) to the stop input.Connect the relay inputs with the corresponding phase.Connect the relay outputs to the loads that should be used.Connect the neutral wire to the neutral wire connector (11).Plug the network cable into the Ethernet socket (RJ45).Connect the device to an AC Adaptor (12V-24V AC or DC).Solar-Log™ Smart Relais Station 3 x 16A: 3 relay inputs. 12 Solar-Log™ Smart Relais Station 1 x 16A: 1 relay input. 11 Neutral wire connection for measurement electronics. 8 Button for OK, Select, or bootloader mode. 5 LED display for load or sensor display. Solar-Log™ Smart Relais Station 3 x 16A: 3 relay outputs. 3 Solar-Log™ Smart Relais Station 1 x 16A: 1 relay output. 2 Stop input for the shutdown of all relays. CD-ROM and manual Installation Number Description 1 Power supply (12V-24V AC or DC). DC connector cable LIY-Z 2×0,75 SW/rt with ferrule, L=10 cm.Solar-LogTM Smart Relais Station 3 x 16A / 1 x 16A.In case of further questions, about Installation, operation, or usage of the device, which are not clear after reading the manual, please do not hesitate to ask our support team.Plastics have to be stored out of range of Please recycle the packaging materials. It has to be used or stored out or range of Please note the safety advice and manuals of connected devices,.Because of safety and approval issues, it is not allowed to modify the device without our permission.Do NOT install them in an area where excessive moisture or heat Is The device is intended for Indoor use only.The device may only be connected by a low voltage power supply (12V – 24V AC or DC).All maintenance has to be performed by factory-trained service personnel. The device contains no user-maintainable parts.The manufacturer does not accept responsibility in case of improper use of the device and particularly any use of equipment that may cause personal injury or material damage.The device must be installed only by qualified personnel according to the following Installation and operating.Possible firmware update in operation via Ethernet.tates of the relay outputs are displayed with bi-colored LEDs on the front page.Simultaneous switching of multiple outputs is prevented by automatic latency of 1 second.The automatic control of the Solar-Log™ takes precedence over the manual operation of the Solar-Log™. All circuit outputs can be switched individually on the device.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |